Sloan Digital Sky Survey
Fermilab Engineering Trip Reports
Trip # |
Purpose of Trip |
Author |
Trip Date |
TR99040 |
Manipulator and Instrument Lift Work |
C. Lindenmeyer |
Apr. 2-5, 1999 |
TR99030 |
Fiducial and Control System Work |
G. Federwitz |
Mar. 1-5, 1999 |
TR99025 |
Fiber Mapper Work |
P. Colestock |
Feb. 21, 1999 |
TR99020 |
Recalibration of Heidenhain ERA 880C Readheads |
W. Boroski |
Feb. 11, 1999 |
TR99010 |
SDSS Interlock System Work |
G. Federwitz |
Jan. 18-21, 1999 |
TR98100 |
SDSS Interlock System Work |
J. Anderson |
Nov. 16-19, 1998 |
TR98090 |
Telescope EngineeringWork at APO |
W. Boroski |
Nov. 10-13, 1998 |
TR98080 |
SDSS Interlock System Work |
J. Anderson |
Oct. 19-22, 1998 |
TR98070 |
Install and Wire New Rotator Motor |
C. Rivetta |
Oct. 8-14, 1998 |
TR98060 |
Telescope Servo System Commissioning |
C. Rivetta |
June 22-27, 1998 |
TR98050 |
Wind Baffle Azimuth Motor Alignment
and Guide Roller Installation |
W. Boroski |
June 9-13, 1998 |
TR98040 |
Telescope and Wind Baffle
Alignment Measurements |
T. Sager |
June 9-13, 1998 |
TR98030 |
Status of SDSS Fiber Mapper System |
P. Colestock |
June 1, 1998 |
TR98020 |
Telescope Servo System Commissioning |
C. Rivetta |
May 12-16, 1998 |
TR98010 |
Windbaffle Servo System Commissioning |
P. Czarapata |
May 13-16, 1998 |
TR97030 |
Rotator and Azimuth Drive Measurements |
C. Rivetta |
July 23-27, 1997 |
TR96010 |
2.5-Meter Telescope Structure Characterization |
S. Hansen |
Oct. 24, 1996 |
Last modified 4/1/99.
To submit a Trip Report for publication, please contact Bill Boroski who will assign a
TR number. You can submit reports in the SDSS HTML Format, as
part of an e-mail message, or as a word document.
Contact Bill Boroski by phone at (630) 840-4344 or by e-mail at boroski@fnal.gov.
|